5. Proposed design and construction of new railway bridge (No 123) Pondok Tanjung, Taiping.

Installation of vertical drain

Installation of vertical drain

Construction of abutment

Construction of abutment

Construction of top chords (inclusive of the temporary support)

Construction of top chords
(inclusive of the temporary support)

Construction of cofferdam for pilecap (inclusive of struting)

Construction of cofferdam for pilecap
(inclusive of struting)

Construction of top chord

Construction of top chord

Completed bridge opened to traffic

Completed bridge opened to traffic

Project Archive