![]() Road Crossing & Box Girder Construction at Ramp D |
![]() Road Crossing& Box Girder Construction at Ramp E |
![]() Road Crossing & Box Girder Construction at Ramp F |
![]() Completed Ramp D |
Project Archive
12. Projek Lebuhraya menghubungkan Jalan Kewajipan di Subang Jaya ke FHR2, NKV & LDP

Mainline PA12 Column

PA5 Column
13. Projek Lebuhraya menghubungkan Jalan Kewajipan di Subang Jaya ke FHR2, NKV & LDP

PA10 Column

RB6 Column
14. Projek Lebuhraya menghubungkan Jalan Kewajipan di Subang Jaya ke FHR2, NKV & LDP
15. Proposed Widening Of The Existing Penang Bridge Low Level Viaduct from East Abutment to Pier 24E and from Pier 24W to Pier 69W, (U-Beam-296 no’s & I-Beam-288 no’s)
![]() Work In Progress for I-Beam |
![]() Side View of I-Beams Steel Forms |
![]() Placement of Concrete For Beam |
![]() Completed I-Beam |
![]() Near View of Beam Tendons |
![]() Side view of U –Beam Steel Forms |
16. Proposed Bridge Joint Repair at KM158.25 Both Bound, Section S2

Installing Joint Compound

Completed Bridge Joint Repair
17. Proposed Remedials Works To Improrer Roadside Drain And Culvert Basin At Culvert Inlet KM305.50 to KM306.10, Section C5, North South Expressway
18. Proposed Remedial Works To Damaged Trapezoidal Drain & Embankment Failure From KM 36.90 to KM 37.10 BB, Section C6
19. Proposed Surface Protection Works To Cut Slope Erotion At KM18.36 East Bound , Section S1, Seremban Port Dickson Highway
![]() Trimming Of Slope |
![]() Laying of Miracell Perforated MCP-100-030 |
![]() Laying of Fibromat MP400 Erosion Mat |
![]() Filling Of Suitable Till |
![]() Placing Of Close Turf |
![]() Laying of Fibro Mat And Hydro Seeding |
20. Menaiktaraf Jalan Dari Seremban Ke Kuala Pilah, Negeri Sembilan (Dari Simpang Senawang – Bukit Putus) Construction Of Vehicular Box Culvert at Ch. 4150 & Construction Of Reinforced Concrete Retaining Wall At Bridge No.2, Abutment ‘B’, CH 6200 – CH 6259 RHS :- Structure & Finishes Works

Menaiktaraf Jalan Dari Seremban Ke Kuala Pilah, Negeri Sembilan (Dari Simpang Senawang – Bukit Putus)
Construction Of Vehicular Box Culvert at Ch. 4150 & Construction Of Reinforced Concrete Retaining Wall At
Installation of steel bar for box culvert Construction of VBC